Saturday, July 12, 2008

 
For Additional Information Contact

Brett Harrell
Executive Director

Evermore CID
2463 Heritage Village
Suite 106
Snellville, GA 30078

(770) 979-5800
Fax (770) 979-0712
Cell (404) 966-5804

bharrell@evermorecid.org

Project
Consultant

Kimley-Horn

Project
Manager

Larry Kaiser
Project Manager

LKaiser@evermorecid.org

Collaborative
Infrastructure
Services, Inc.

  NOTE: These are Adobe Acrobat files. Download the free
PDF reader here.

 
Walton Ct at old U.S. 78 Intersection Alignment
Evermore CID
Project identified by 2005 LCI Corridor Study


Intersection at U.S. 78 and Walton Court / Old U.S. 78

This intersection improvement was identified in the LCI Corridor Study completed in December 2005. The realignment of old U.S. 78 with Walton Court will provide a fully signalized intersection improving safety and mobility.

Evermore CID Board selects Kimley-Horn to design intersection realignment



P.O. Box 412, 2463 Heritage Village, Suite 106, Snellville, GA 30078
 [O] 770.979.5800  |  [F] 770.979.0712  | 
Brett Harrell Executive Director

© Copyright 2003-2008,
Evermore Community Improvement District
 All rights reserved.